
Strata · Body corporate · Owners corporation
Turn common-property energy into an asset.
Solar, battery storage and incentive programs for apartment buildings, engineered, installed and administered by one accountable partner.
01What we engineer for buildings
Common-property energy, solved properly.
BESS3 battery storage
NSW PDRS pathway for eligible Class 2 apartment buildings, batteries from over 20 kWh to 200 kWh usable capacity.
Common-area solar
Rooftop PV engineered for common-property loads: lifts, lighting, ventilation, pools and pumps.
EV-charging readiness
Load assessment and infrastructure planning so the building is ready when residents are.
Demand reduction
Peak-demand management for common-property circuits to reduce network charges.
Backup strategy
Keep essential common services running through outages.
Energy monitoring
Circuit-level visibility so committees can see exactly where the money goes.
Incentive administration
Certificate creation and scheme paperwork handled as part of delivery.
02Strata battery feasibility checker
Is your building a candidate?
Indicative only, a proper assessment models interval data, roof area, switchboard capacity and scheme eligibility.
Indicative result
- BESS3 size eligibility
- Likely eligible (4+ dwellings)
- Indicative battery band
- 40–80 kWh
- Solar pathway
- Battery + new solar option
- Scheme availability
- From 1 Sep 2026
Indicative only. Eligibility, incentive values and program rules are confirmed during assessment and can change. Minimum eligible purchaser payments apply under BESS3.
Committee-ready documentation, feasibility reports and incentive modelling available. Talk to our strata team
